DC-EC · Public read-only demo

Sample network: 4,500 TR community, 2 plants, 9 ETS

This page shows typical DC-EC output for a sample district cooling network, as static text and tables, so reviewers can read it without signing in. The real app is interactive: engineers trace pipes on a satellite map, place plants and ETS rooms, and the app sizes pipes, finds the governing ETS, sets secondary pump head and runs an 8,760-hour simulation. Figures below are illustrative of the sample case.

About DC-EC · Request access

1. Design basis

Network design parameters
ParameterValue
Community coincident peak4,500 TR (15.8 MW)
CHW supply / return4.5 °C / 12.5 °C (ΔT 8.0 K)
Design flow472.2 L/s
Friction methodHazen-Williams, C = 130
Velocity limit (mains)≤ 2.5 m/s
PlantsPlant 1 and Plant 2, 2,250 TR each (3 × 750 TR modules), 50/50 duty share
ETS rooms9 × 500 TR, mixed office / residential / retail profiles
Plant internal loss8.0 m
ETS design ΔP12.2 m (HX + PICV + strainer)

2. Load split and null point

Plant catchments at the design hour
PlantRating (TR)ETS servedServed load (TR)Utilisation
Plant 12,250ETS 1–52,500111 %
Plant 22,250ETS 6–92,00089 %

Null point (flow boundary between plants) sits at chainage 1,979 m from Plant 1. Plant 1 is overloaded at the design hour; the Plant page flags this and suggests re-routing or adjusting duty shares.

3. Pipe sizing and secondary pump head

Governing path — ETS 5 (index station)
ComponentHead (m)
Plant internal8.0
Main friction to tie-in67.4
ETS branch1.6
ETS design ΔP12.2
Total secondary pump head89.3
Size options (all segments stepped together)
OptionMain DNPump head (m)Network CAPEX (M $)
Base (adopted)DN40089.37.38
+1 sizeDN45056.8≈ 8.0
+2 sizesDN500≈ 44≈ 8.7

Second-worst ETS is ETS 9 at 76.6 m (12.7 m margin). The governing ETS is found by evaluating every station, never assumed.

4. Hydraulic grade line and TES overspill check

Supply and return heads are plotted against distance from each plant. Return head lands at each plant's TES tank datum; ETS rooms near a plant receive excess differential pressure that their PICV absorbs.

Sample HGL points (design hour)
ETSDistance (m)Available ΔP (m)Design ΔP (m)PICV excess (m)
ETS 132071.512.259.3
ETS 398044.012.231.8
ETS 51,85013.812.21.6
ETS 92,60026.512.214.3

TES overspill: return head at each plant's tie-in is compared with its tank top water level. Sample result — both plants OK.

5. 8,760-hour dynamic operation

Selected hours (building diurnal shape × monthly factor)
HourLoad (TR)Flow (L/s)Pump head needed (m)Approx. speed
Aug 14:00 (design peak)4,50047289.3100 %
Apr 12:00 (shoulder)3,1503315276 %
Jan 03:00 (winter night)1,0501102452 %

The full-year scan reports lowest and highest pump head, hours of TES overspill risk, how often each ETS governs, and a head duration curve.

6. CHW corridor reservation

Trench basis (side-by-side S + R)
Main DNInsulation (mm)Pipe gap (mm)Side clearance (mm)Cover (m)Reserve width (m)
DN400804005001.50≈ 2.4
DN300804005001.50≈ 2.2
DN200804005001.50≈ 1.9

ETS branches are treated as road crossings and are not listed as corridors.

7. Network CAPEX build-up

Per segment: trench/m × length + 2 × pipe/m × length (supply + return) + fittings 25 % + testing and flushing/m + valve chambers (one per ETS branch plus each isolation valve dropped on the map), all × (1 + preliminaries 15 %).

Adopted option summary (illustrative)
ItemUSD M
Trench & installation2.67
Pipe supply (S + R)2.21
Fittings (25 % of pipe)0.54
Testing & flushing0.14
Valve chambers0.84
Preliminaries (15 %)0.96
Total7.38